First Built
|
: |
1982 |
Capacity
|
: |
906 cu m per hour |
|
: |
765 litres (27 cu ft) |
|
: |
|
Trommel Screens
|
: |
2 units - 2.74 m (9 ft - 0 in) dia x 18 m (59 ft - 5 in) lg |
Primary Jigs
|
: |
56 units - 4 cells Yuba Jigs |
Secondary Jigs
|
: |
8 units - 4 cells Yuba Jigs |
Tertiary Jigs
|
: |
4 units - 4 cells Yuba Jigs |
Tailings Disposal
|
: |
By Pumping |
|
: |
|
|
: |
91.46 m (300.0 ft) |
|
: |
23.0 m (80.0 ft) |
|
: |
29.0 m (94.0 ft) |
|
: |
3.93 m (12 ft 10 1/2in) |
|
: |
3519 kW (4727 HP) |
|
: |
35467 tonnes |
|
: |
39.7 m (130 ft) |
|
: |
26 to 30 buckets/min |
The transfer of used modern dredges is a very cost effective approach in acquiring bucketline dredges. Substantial saving is achieved by this method. The reconstructed dredge will give many years of trouble free operation as evident by P.T. Koba Tin's experience with their transfer of two big capacity dredges.
|
The above specifications are subject to change without prior notice. |
Please contact us for further details.